What the regulations require

In the US, 21 CFR 211.188 sets the contents of the batch production and control record: an accurate, checked copy of the master record, and documentation of each significant step, including dates, major equipment, component identification, weights and measures, in-process and laboratory results, area inspections, yields, labeling records, containers and closures, sampling, the people performing and checking each step, and any investigation. 21 CFR 211.192 requires the quality control unit to review and approve these records before release and to investigate unexplained discrepancies.

EU GMP Chapter 4 sets similar contents for the batch processing record, including the operators for each significant step, the materials actually weighed, in-process control results, yields and signed authorisation for any deviation from the processing instructions. The checklist below covers both. Adapt the detail to your own master records, and keep it under document control so every reviewer works from the same version.

The checklist

Record setup

  • The record was issued from the current approved master record, and the copy was checked, dated and signed
  • Product name, strength, batch number and batch size are correct on every page
  • All pages, attachments and printouts are present and paginated

Materials and equipment

  • Each component and in-process material is identified by lot, and each lot was released for use
  • Weights and measures match the formula and are within tolerance, with second-person checks where required
  • Major equipment and lines are identified, and were clean, calibrated and in status

Process steps

  • Every significant step is documented with date, time and the people who performed and checked it
  • Process parameters, times and hold periods are within the master record’s limits
  • In-process control results are recorded, within limits and signed
  • Area and line clearance before and after use is recorded

Yield, packaging and labeling

  • Actual yield and percentage of theoretical yield are calculated correctly and within limits at each required phase
  • Labeling control records are complete, with specimens or copies of the labeling used
  • Label and packaging material reconciliation is within limits
  • Containers, closures and sampling are documented

Documentation practice

  • Entries are legible, in indelible ink and made at the time of the step
  • Blank fields are voided, signed and dated
  • Every correction leaves the original readable and is initialled, dated and explained where appropriate
  • Calculations and transcribed values agree with source printouts

Deviations and release

  • Every deviation from written procedures is recorded and justified
  • Every referenced deviation and investigation is closed, with conclusions and follow-up recorded
  • Laboratory results for the batch are complete and meet specifications
  • Production review is complete before QA review, and QA approval precedes release

Using the checklist well

A checklist makes reviews consistent, but only if every reviewer uses it the same way and records what was found. Keep it in your review SOP, tie each item to the field in the master record it applies to, and log findings by checklist item so you can see which items fail most often. Those counts point directly at the forms and steps that need fixing.

Order matters too. Checking the record setup and materials first means a wrong master record version or an unreleased lot is caught before anyone spends time on process detail. Leaving deviations and laboratory results to last means the reviewer sees the full picture before deciding whether open items block release. Where sections of the record are finished early, they can be reviewed as they are completed rather than all at once at the end.

Many of these items are rule checks: is a value within limits, is a signature present, does a calculation carry through. Those can be checked automatically on every entry, leaving reviewers to work from the exceptions. That approach, review by exception, is covered in a separate guide.

How Litewave fits

Litewave reads paper or electronic records, checks every entry against your master record and specifications, and shows QA only the exceptions, each linked to the page it came from. Your checklist becomes the rulebook it applies. Litewave proposes, qualified people approve, and it never dispositions a batch on its own.

Questions we get asked

Who should review the batch record?

Production reviews it first, then the quality unit reviews and approves it before release. PIC/S PI 041-1 also expects critical steps to be witnessed or verified at the time they are performed.

Does the checklist need to be part of an SOP?

It should be. A controlled checklist referenced in your review procedure makes the review repeatable and gives inspectors a clear view of what QA checks.

Should the checklist differ by product?

The structure can stay the same, but the critical parameters, limits and checks come from each product’s master record, so the detail differs by product and process.

Sources

  1. 21 CFR 211.100, Written procedures; deviations (eCFR)
  2. 21 CFR 211.188, Batch production and control records (eCFR)
  3. 21 CFR 211.192, Production record review (eCFR)
  4. EudraLex Volume 4, EU GMP Chapter 4, Documentation
  5. PIC/S PI 041-1, Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments