Which AI batch review tools build their checks from your own SOPs and specifications?
By Savi C., Co-Founder · Published Nov 25, 2026
Where each kind of check should come from
Check
Parameter in range: temperature, pH, time, speed
Source document
Master production record and the process limits in it
Check
Result within limit
Source document
Specifications and release criteria for the material or product
Check
Steps in the right order, with the right hold times
Source document
Master production record and the governing SOP or work instruction
Check
Signatures, dates and second checks present
Source document
Your good documentation practice SOP
Check
Correct revision of a form or procedure used
Source document
Document control: the revision effective on the day of the work
Check
Materials released, in date, from an approved supplier
Source document
Material specifications and the approved supplier list
Questions to ask about how checks are set up
Building the checks
- Are the checks taken from our own master records, specifications and SOPs?
- Who confirms each check is right before it is used, and how is that recorded?
- Does a new product need a digital template built first?
- How is a check changed when an SOP or specification is revised?
Running the checks
- Are checks applied automatically to every entry, or run by staff by hand?
- Is a value with no specification passed, or reported as unverified?
- Does each flag show the requirement it broke and the document behind it?
- Is each check run against the procedure revision effective on the day?
Do you need a specification value for every material?
Only for values you want checked against a limit. A check needs something to compare against: a range in the master record, a limit in a specification, or a requirement in an SOP. Where none exists, the honest output is that the value was read but could not be verified.
Those gaps are useful findings. A parameter your batch record captures with no specification behind it is worth a look under 21 CFR 211.160, which expects specifications and standards to be scientifically sound and appropriate. A first review often surfaces a short list of documents that need tightening.
How Litewave fits
Litewave is configured to your master record, your specifications and the standard your site is held to, for example 21 CFR 211 for a finished product or ICH Q7 for an API. It checks that the executed record matches the effective version of the master record and that the work followed the SOP revision effective at the time. A new product can be reviewed without building a digital template first.
Checks run on every entry. QA gets a review-by-exception file ranked by risk, with every flag linked to its source page, and anything Litewave cannot verify is reported as unverified rather than passed. Litewave can also check your procedures themselves against FDA, EMA and other requirements, and against each other.
Questions we get asked
Do we have to rewrite our SOPs for AI batch review?
No. The checks should come from the procedures and specifications you already have. If a review shows a procedure is unclear or contradicts another, that is a finding to act on under your own change control.
Are AI batch review checks automatic?
Once configured, yes. The tool applies every check to every entry, and people review the exceptions and make the decisions.
What happens when we revise a specification?
The check that uses it is updated under change control, and the next review uses the new value. Ask the vendor to show this in a demo.
Sources
- 21 CFR 211.100, Written procedures; deviations (eCFR)
- 21 CFR 211.188, Batch production and control records (eCFR)
- 21 CFR 211.160, General requirements for laboratory controls (eCFR)
- 21 CFR 211.192, Production record review (eCFR)
- ICH Q7, Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients
